2011 – RIGHT OF WAY MAINTENANCE
- Highway Right of Way widening on HWY 106 between km 90 & km 120
-
Corner widening, soft ground clearing
WINTER-TEMPORARY ROAD CONSTRUCTION
-
Freeze and clear road for power line maintenance and pole structure repairs on E.B. Campbell Hydro Station Transmission line.
-
Light brush removal and Right of Way clearing , various locations.
2010- SEWAGE LAGOON EXPANSION
-
55,000 cu. meter storage cell & flow cell in south west Saskatchewan.
-
Town tie-in , Manhole, and facility installation
-
125 meter by 10 inch insulated pipe line installation
-
Over excavation to embankment, replaced with sealed & compacted clay liner.
ROAD RECONSTRUCTION
-
Reconstruct 7 km of class 4 primary Grid road
-
Speed curve construction to improve traffic flow in the west central Saskatchewan oilfield
-
Water drainage and culvert installation
-
Landscaping & topsoil addition of all completed areas
-
Gravel surface incorporation & re-compaction
-
Removal of brush and topsoil withing original road bed and rebuild with proper compaction and material
-
Surface and shoulder rock separation
2009 – SUBDIVISION DEVELOPMENT
-
Develop subdivision as add-on to existing towen site in central Saskatchewan.
-
Earth volumes of up to 40,000 cu. meters
-
Manhole and service installations for 25 new town lots
-
Water Main tie in and installation and water service to all 25 lots. (pressure tested)
-
street construction & curb installation
2008- LARGE DIAMETER CULVERT INSTALLATION
-
Stream bed preparation and diversion fro construction
-
Assembly and installation of 4 – 3m x 90m corrugated steel culverts
-
Riparian erosion control and silt fencing
-
30,000 cu. meters of road grade reconstruction
ROAD MAINTENANCE CONTRACT
-
Motor Grader surface reconstruction and maintenance
-
Rip & Re lay in designated problem areas
-
Water Drainage improvements, culvert repair and replacement
-
Right of way clearing & brush removal
RIGHT OF WAY MAINTENANCE
-
Soft and hard ground crawler brush removal in Northern Saskatchewan
-
Riparian areas done with hand tools to minimize disturbance to stream embankments
-
silt fence installation
2007 – ROAD EMBANKMENT STABILIZATION
-
Remove 10,000 cu. meters of unstable earth embankment from road shoulder and back slope near flowing stream and replace with weeping aggregate.
-
Re-compact with weeping tile and crushed aggregate as replacement for unstable material
-
Erosion control and silt fencing
ROAD RECONSTRUICTION AND MAINTENANCE CONTRACT
-
2000 HR. Grader contract over 4 months
-
widened and upgraded 80 km of secondary highway in east central Saskatchewan
-
Surface rip and re-lay of desiganted problem areas and upgrade for heavy-haul traffic
-
water drainage and culvert repairs
LEASE CONSTRUCTION & DRILL RIG SUPPORT
-
Stripping & preparing muskeg diamond drill leases for winter drilling program.
-
Winch truck and crawler tractor support for Rig mobilization
1990-2006 – LOGGING ROAD CONSTRUCTION / SUPPORT
-
Truck and lowbed support for logging contractors in north central Saskatchewan
-
Muskeg road construction for heavy log hauls
-
All weather road construction/maintenance and support
-
Culvert cleaning/repair/replacement
-
portable bridge installations and repair
-
Stream crossing preparation / Reclamation
-
Road Reclamation
-
Bio engineering & Riparian areas
2005 – ROAD MAINTENANCE & RECONSTRUCTION
-
3 Year contract in Central Saskatchewan
-
Road repair and upgrade
-
Reform and compact to with stand heavy haul traffic
-
Gravel to surface incorporation
-
Water drainage and culvert Repair & Replacement
-
Logging Support
2004 – WINTER ROAD / DIAMOND LEASE CONSTRUCTION
-
Construct 65 km of muskeg road for diamond drill access in Central Saskatchewan.
-
Ice bridge construction several major & minor stream crossings
-
Water Hauling and vac services for diamond core rigs
-
Lease construction/preparation & reclamation
-
Road maintenance.